Boatseekr is a modern platform for a timeless pursuit — from first search to first sunset, we've got you covered.
Real Brokers, Real Boats - no noise.
AI powered image search - Find your boat in seconds.


In 2018, all three hot-water boilers were replaced and all engine room lights were upgraded to new LED lighting.
In 2021, a complete external structure repaint was carried out using Awlgrip original white color code. New Humphree servo units and a trim control system were installed, along with four Humphree servo units and four fins (1.5 m²) with gyroscope system. AGM batteries and two Victron 100A battery chargers were installed, and a new teak deck was fitted on the main deck. New AGM starting batteries were added for main engines and generators, along with new emergency radio bridge batteries. All six engine room ventilation fans were overhauled, and stern winches were refurbished.
In 2023, new laundry machinery was installed including two Miele Professional dryers and two Miele Professional washing machines. New kitchen equipment was added: a Miele Professional dishwasher, new Miele oven, induction plate, professional blast chiller, Miele combi oven, and a new kitchen hood. The complete replacement of external window Sica silicone was performed. The firefighting pump, bilge pump, sea water air-conditioning pumps, circulation air-conditioning pumps, and emergency firefighting pump were all overhauled. The swimming ladder, gangway, tender garage crane, jet-ski garage crane, hydraulic power pack units, and all associated pipes underwent complete overhaul and repainting.
In 2024, a complete overhaul of the engine room was undertaken. Both main engines were removed for full overhaul at MTU Camaga Naples with test bench verification. Both ZF 7550 gearboxes were removed and fully overhauled by ZF Official Coffetti Srl Padova with test bench testing. The Kamewa S3 water jets were removed and overhauled by G-Jets Official Kamewa Dealer Italy. Two new Kohler 70 kW generators were installed with resistive load testing and upgrade of the PLC load-sharing control system. All three main switch shore lines and generator switches were replaced, generator mufflers were replaced with new exhaust manifolds, and all bilge sea chest valves were completely overhauled with replacement of underwater generator cooling discharge valves. New engine exhaust manifolds with a new insulation system by Cofeme Milano were installed. The firefighting manifold, valves, and hoses were overhauled, windlass gearboxes, brakes, and clutches were overhauled with installation of new electric motors, and external tables were painted.